During the construction of the Tele2 Arena, the Stockholm Municipality and PEAB chose to make use of design flooring on large su

Tele2 Arena is one of the world’s most modern multi-purpose arenas, with capacity for up to 40,000 spectators. During the construction of the arena, Linotol was entrusted with the task of installing around 24,000 m² of concrete design flooring in the facility. In addition, we were given the responsibility of pouring 3,500 outdoor steps with tinted concrete, to be used as emergency exits from the facility.

Tele2 Arena

24 000 sqm

Project period

2013

Location

Stockholm
Show on map

Business area

Design flooring

Space

Commercial space

Work type

Laying of 20 mm tinted design concrete

Project images

Reference assignments

Concrete flooring and constructions North/East Concrete flooring and constructions West Concrete floors and constructions South Indoor parking Design flooring Seamless flooring Tiled and Terazzo flooring Flooring maintenance Entrance zones
Volvo Köping

Volvo Köping

Köping